End User: SONELEC
Country: Comores
Supported by: United Nations Development Programme – UNDP
Delivery time: 2022
Project Brief:
The national electricity network runs along the national road which crosses Chézani. A post is located at an angle to the immediate safety perimeter of the drilling site. A line dedicated to the site's electrical installations will be installed with a 160 kVA MV / LV transformer: this line will supply the technical building.
A line will also be laid between the road and the R-01 site as well as a 50 kVA transformer capable of providing emergency power to the recovery pump of the R-01 structure.
We successfully won the bid and delivered EPC contract turnkey solutions.